El Paso District east area project, maintenance closures
Montana Widening Project
Monday, March 31 to Tuesday, April 1Widening Project
Wednesday, April 2 until Friday, December 26, 2025
- Montana Avenue, eastbound frontage road reduced to one lane from Lee Boulevard to Tierra Este Road
- Montana Avenue and Joe Battle intersection, northbound and southbound of Joe Battle through lanes closed
- Montana Avenue westbound frontage road reduced to two lanes from Tierra Este Road to Joe Battle Boulevard
Crews will be working on building underpass.
Purple Heart 375 Widening Project
Saturday, March 28 to Wednesday, April 31
Daily, 8 a.m. to 4:30 p.m.
- Purple Heart Highway (Loop 375) north- and southbound
alternate lane closures between Montana Avenue and Iron Medics Drive
Crews will be paving and boring in median.
Continuous closure until further notice
- Purple Heart Highway north and southbound shoulder closures from Montana Avenue to Spur 601
Crews will be widening main lanes and constructing north and southbound frontage road.
Loop 375 Widening Project
Monday, April 7 to Thursday, April 11
Nightly, 9 p.m. until 5 a.m.
- Loop 375 northbound main lane closed between Pan American Exit Ramp and North Loop
Entrance Ramp
Crews will be working on concrete paving and joint repairs
Continuous closure, beginning 6 a.m. Saturday, April 5 to 4p.m. Friday, April 11, 2025
- Loop 375 northbound North Loop Exit Ramp closure.
Crews will be working on concrete paving and joint repairs.
Horizon/Darrington Reconstruction Project
Monday, April 7 to Friday, April 11
Daily, 9 a.m. to 4 p.m.
- Horizon Boulevard (FM1281) westbound right shoulder closed at Darrington Road
- Horizon Boulevard (FM1281) eastbound right lane closed at Darrington Road
- Roslyn Drive at Darrington Road will be closed to through traffic Access to Darrington Road will be via Benton
Street/Eastlake Drive
Crews will be boring conduit for future traffic signals.
Continuous closure, beginning 7 a.m. Monday, March 24 through 4 p.m.
Friday, April 18
- Darrington Road northbound will be closed at Roslyn Drive
Crews will be installing new lateral utilities at Roslyn Drive, including inlets, storm drain, sewer and water
laterals.
Continuous closures
Friday, February 14 at 4 a.m. until May 2025
- Horizon Boulevard (FM1281) eastbound complete closure between Horizon Crossing to
Breaux Street.
Crews will be working on final subgrade, pavement operations and excavating ponding areas.
Tuesday, February 18 at 4 a.m. until December 2025
- Darrington Road southbound lanes will become two lanes two-way traffic.
- Pete La Rue Circle will follow detour entrance at Roslyn Drive and Exit Jasper
Drive.
Crews will be working on final subgrade, pavement operations and milling.
I-10 Landscape & Aesthetic Project
Monday, April 07 to Friday, April 11
Daily, 7 a.m. to 3:30 p.m.
- I-10 east- and westbound right lane and shoulder
closure at Lee Trevino. - Gateway East Boulevard right lane closure between Tower Trail Lane and Zaragoza Road
- Gateway West Boulevard right lane closure between Zaragoza Road and Lee Trevino Drive
- I-10 Westbound between Yarbrough Exit Ramp and Yarbrough Entrance Ramp right lane and shoulder closure
- I-10 Westbound between Zaragoza Exit Ramp and Zaragoza Entrance Ramp right shoulder closure
- Gateway East Boulevard left lane closure between Zaragoza Road and Zaragoza Entrance Ramp
- I-10 Westbound between Yarbrough Entrance Ramp and McRae Exit Ramp right shoulder closure
- I-10 Westbound McRae Exit Ramp complete closure Gateway West Boulevard left lane closure between Sumac
- Drive and McRae Exit Ramp
Crews will be painting concrete riprap, boring conduit & placing electrical pole, landscaping, and placing concrete riprap.
PROJECTS WITH CONTINUOUS CLOSURES
I-10 Hudspeth Safety Rest Area
Continuous closure until April 19
- I-10 east- and westbound shoulder work between Fort
Hancock and McNary
Crews will be working on surface grading.
Median Concrete Barrier Project
Continuous closure until further notice
- Montana Avenue (US62/180) east and westbound complete left lane closure between RM 124 and
RM 126 (Guadalupe Peak)
Traffic will be reduced to one lane in work areas.
Closure is necessary for installation of median concrete barrier.
RM 652 Full Widening Project
Monday, March 11 until further notice
- RM 652 westbound lanes reduced to one lane two-way traffic from FM 3541 to Kimble Draw Bridge
Closure is necessary for the reconstruction of the roadway.
Please follow the detour signs in place on all projects. All work is dependent upon weather conditions.